The pattern in it
From the middle of a yard, down to the foot of its mast
Jeers, truss tackles, clew garnets, slab-lines, topsail sheets and topgallant halliards all land at the bitts. The topsail sheet starts at a yardarm but is brought in along the lower yard to the quarter block before it turns down, so it counts as a line from the middle.
From a yardarm, down to the ship’s side
Lower lifts come to a block at the side abreast the shrouds. Topsail halliards come to the channels and in over the side. Topsail lifts end at the deadeyes. Course tacks and sheets come in through the side. The exceptions are buntlines and leech-lines, which go up to the top first and come down to the breast-rail.
Braces to the next mast aft, each to a different place
Fore braces to the bitts on the quarterdeck abaft the mainmast; fore topsail braces to the boat skid at the after end of the forecastle; fore topgallant braces to the belfry. Main braces right aft to the quarter; main topsail braces to the bitts abaft the mizen mast; main topgallant braces into the mizen shrouds. The crossjack braces alone lead forward, and cross. Wartime preventer braces lead the opposite way to the working ones, so one shot does not cut both.
Not “the higher the sail, the further aft”
That rule is often given for later ships with long pin rails. Steel’s fore braces run the other way. What his leads do show is that the lighter and higher the gear, the higher up it stops: topgallant lifts and buntlines belay in the top; topsail lifts and buntlines and topgallant clewlines stop at the lower shrouds; only the heavy gear of the topsails and courses comes to the bitts and the range cleats.
Bowlines and buntlines forward, halliards abaft
Gear that hoists comes down abaft its mast. Gear that hauls a sail forward or up to its yard tends to land forward of it. So a good deal of the mainsail’s and main topsail’s gear is worked from the forecastle, and the fore yards are braced from the quarterdeck. This is a generalisation from Steel’s entries, not something he states.
Three pairs cross to the opposite side
The main bowlines, the crossjack braces and the mizen topsail bowlines each belay on the side opposite to the one they serve.
The heaviest work is a deck down
The fore sheet, main tack and main sheet come in through sheave-holes in the side to cleats on the upper deck, and the main topsail sheets and clew garnets to bitts there. In large ships the fore tack came in under the forecastle too.
Steel 1794, pp. 202–213, 235; Lever 1819, pp. 48–49, 54, 57.
Why it had to stay the same
No Admiralty order fixing where ropes belayed has turned up, and Steel offers alternatives: “a cleat … or to the topsail-sheet-bitts”, and of one rope that it “belays where most convenient”. Fittings on the bulwarks were within the reach of a ship’s own carpenters and the taste of her captain and boatswain. Consistency was custom in the service and strict habit within a ship.
It was learned by doing. Falconer declined to describe the leads at all: “To explain the track of every particular rope, through its different channels, would be equally useless and unintelligible to a land reader: to mariners it was superfluous: and even the youths who are trained to the sea, would reap little advantage from it; because their situation affords them much better opportunities of making these minute discoveries.” Lever wrote the Sheet Anchor to fill that gap for young officers who “feel a diffidence in soliciting information, either from a fear of exposing their ignorance, or from an idea that such a request may be treated with ridicule”.
Some fittings sort the ropes for the men: Falconer describes the rack at the bowsprit as a frame of sheaves “to direct the sailors to the respective ropes passing through it”, and Steel has trucks seized to the shrouds “to lead ropes through, that they may be more readily found”.
The argument from darkness is stated outright only later, and by an American: “So much of the handling of gear is done in the dark that the men may be confused, perhaps at a critical moment, if the position of any running rigging is frequently varied from that sanctioned by well-established custom” (Luce, Text-Book of Seamanship, 1891 revision). It is a fair statement of the principle, but it is not evidence for the Royal Navy of 1805.
Falconer 1769, preface and “Rack”; Lever, preface; Steel 1794, pp. 179, 225; Luce 1891, p. 155.
How far to trust this plan
The positions come from the leads Steel gives in 1794, with Lever where he adds something. Where they say only “upon deck”, the point is drawn near the foot of the mast or at the side and marked hollow. The standard modern authority, James Lees’s Masting and Rigging of English Ships of War, has belaying plans that would settle many of the hollow points; I could not read it, and what is reported of it at second hand is contradictory on dates. The positions of kevels, cleats and timberheads along the bulwarks are not on the Admiralty deck plans, so points “at the side” are right as to which deck and roughly how far aft, and no better. HMS Victory as she stands reflects her restoration in the 1920s and is not used as evidence here.